E&TS works with our clients in master planning green field terminal facilities and working to maximize available space in brown field facilities. We provide tank farm, truck and rail loading, pipeline, and marine asset layouts that maximize storage volumes with efficient process and operational design for planned through-put of products. Large Capital Expansion projects that E&TS will provide the best value will range from $50 MM to $500 MM Total Installed Cost (TIC).