Project: MEG Project
Location: Freeport, Texas
E&TS was retained by Lloyd to perform the FEED and Detailed Engineering considering Process, Mechanical/Piping, Electrical and Instrumentation Disciplines for new grass roots terminal project in Freeport, TX. (April 2017- March 2018)
Detailed Design of Tank Farm/Site Layout, 13 API 650 Tanks, Total 619K BBL Storage, Products included Crude condensate, Monoethylene and Diethylene Gylcols, Waste Water and several other products; specific Manifold Layouts, Hydraulic Analysis w/Pump Specification, Emergency/Fire Case Relief Analysis, Process & Utility Piping, Major & Minor Equipment Specification, All site Electrical & Instrumentation Design, MCC Layout w/Gear, Site Lighting, Procurement Assistance, HAZOP Assistance.
Project: Stolthaven Utility Pipelines Project
Location:Channelview, Texas
E&TS was retained by Lloyd to perform the FEED and Detailed Engineering considering Process, Mechanical/Piping, Electrical and Instrumentation for Utility Systems in existing terminal in Channelview, TX. (June 2017-March 2019)
Detailed Design of Mechanical Utility Piping with Capacity/Sizing Evaluation of usages, Utilities included Natural Gas, Nitrogen, Air, Potable Water, Waste Water, Marpol, Steam and Condensate, Estimate Development for Procurement & Installation Services, Bidding Process Assistance, Surge Tank Farm Layout, Wastewater & Marpol Manifold Layout, Dock Sump and Surge Tank Pump Hydraulic Analysis w/Pump Specification, Major & Minor Equipment Specification, Dock 11 Firefighting Design, All site Electrical & Instrumentation Design, MCC Layout w/Gear, Site Lighting, Procurement Assistance
Project: LBC Dock #5 Project
Location: Seabrook, TX
E&TS was retained by Lloyd to perform the Detailed Engineering considering Process and Mechanical/Piping, Electrical and Instrumentation disciplines for Dock # 5 project on existing terminal in Seabrook, TX.(May 2017-March 2018)
Detailed Design of Mechanical Piping Layout routing Bunker, Chemical Waste, Vapor, Utility Water, Potable Water, Nitrogen, Natural Gas 2 x 24" and 1 x 30" product lines, Sump Hydraulic Analysis w/Pump Specification, Major & Minor Equipment Specification, All Dock related Electrical & Instrumentation Design, Piping Manifold on Dock, Connection to Loading Arms, Sump Piping and Pump Specification, Marpol connections for offloading and Dock Safety Skid connections